Manassas Park |
Code of Ordinances |
Chapter 25. WATER, SEWERS AND SEWAGE DISPOSAL |
Article V. INDUSTRIAL COST RECOVERY SYSTEM |
§ 25-116. Formula for computing payments.
Latest version.
ICR = Qf / Qd × QU + BODf / BODd + BOD u × SSf / SSd × SS u + Nf / Nd × N u × ;frac;P
Where:
ICR = Cost to be recovered from an industrial user ($/billing period). Qf = The sum of the federal grant costs allocable to flow capacity ($). Qd = The design flow capacity of the treatment works (gallons/day). Qu = The average quarterly waste water flow contributed by the user during the billing period (gallons/day). BOD f = The sum of the federal grant costs allocable to BOD 5 capacity ($). BOD d = The design BOD 5 capacity of the treatment works (pounds/day). BOD u = The average daily poundage of five-day biochemical oxygen demand twenty (20) degrees contributed by the user during the billing period (pounds/day). SS f = The sum of the federal grant cost allocable to suspended solids capacity ($). SS d = The design suspended solids capacity of the treatment works (pounds/day). SS u = The average daily poundage of suspended solids contributed by the user during the billing period (pounds/day). N f = The sum of the federal grant costs allocable to nitrogen capacity ($). N d = The design nitrogen capacity of the treatment works (pounds/day). N u = The average daily poundage of nitrogen as N contributed by the user during the billing period (pounds/day). P = Length of the billing period (days). R = Length of the cost recovery period (days). (Ord. No. 80-1700-151, 3-4-80)
(Ord. No. 80-1700-151, 3-4-80)